Source: EPA UCMR 5, final data (files dated 2026-10-15), samples 2023–2026 (method).
UCMR 5 results do not indicate compliance or noncompliance with the federal limits (EPA). Compliance is judged on later monitoring that systems report to their state.
The federal limits and this system
- Above 4 ppt for PFOA and PFOS.
- At least one PFOA or PFOS result at or above 12 ppt.
What the 2026 EPA proposals change
Ridgewood Water supplies Ridgewood and several neighbouring towns in Bergen County, mainly from dozens of wells grouped at small treatment plants, plus water bought through connections with other suppliers. That structure explains how its UCMR 5 results look. Of the system's 17 sampling points, 15 averaged above the federal 4 ppt limit for PFOA or PFOS: all of them for PFOA, and 11 of them also for PFOS. None was very high: the highest averages were around 30 ppt PFOA, at the Prospect, Stevens and Cedar Hill plants, with PFOS mostly between 8 and 14 ppt. Most of these samples date from 2023.
This is the pattern seen across northern New Jersey, where PFOA is widespread in groundwater at moderate levels rather than concentrated at a single source. Even the water Ridgewood receives through its connections had PFOA above 4 ppt in some samples.
New Jersey's limits
New Jersey's own limits, 14 ppt for PFOA and 13 ppt for PFOS as running annual averages, were adopted in 2020. Many of Ridgewood's plants were above the state's PFOA limit in these samples as well as above the stricter federal one. The utility publishes quarterly notices on its website; those are the place to see current results for each plant.
Treatment since the samples
Ridgewood Water is adding treatment at its well plants. Its own construction update of 29 September 2025 lists twelve PFAS treatment facilities: ten using granular activated carbon and two, East Ridgewood and West End, using ion exchange resin. The first two, Carr and Twinney, have operated since September 2019 and August 2022; Prospect and Ravine were scheduled for October and November 2025, East Ridgewood, West End, Wortendyke and Ames for January to April 2026, Eastside, Mountain and Main for October 2026, and Cedar Hill, the last, for March 2027. The same update puts the current cost projection at $98 million, including engineering and inspection, against $89 million in the 2020 master plan, or $117 million adjusted for inflation. Part of the work is financed through New Jersey's State Revolving Fund.
Schedules like these can slip. A local newspaper, Wyckoff News, reported on 31 July 2026, citing the utility's weekly update, that seven of the twelve facilities were online, four more were due by the end of 2026, and the last was delayed to the first quarter of 2027 by an archaeological study required by the state. We could not reach the utility's website on 28 November 2026 to confirm how many are running now.
That means the figures in the table below, mostly from 2023, describe the water before most of this treatment existed. For a plant that has since been fitted with treatment, the utility's latest quarterly notice is the better guide.
What the federal proposals mean here
The limits Ridgewood's water was above are the PFOA and PFOS limits the EPA proposes to keep. Several plants had results above 12 ppt, so under the May 2026 proposal the utility would need interim measures if it asked for extra time; under its current timetable it expects to be finished before the federal deadline of 2029.
Sources
- EPA UCMR 5 final data, results for system NJ0251001 (all PFOA and PFOS results listed in the table below).
- Ridgewood Water, Ridgewood Water PFAS Treatment Construction Update, 29 September 2025, linked from its PFAS Resources page (archived copy of 13 July 2026).
- American Water Works Association, article of 21 October 2025 (State Revolving Fund financing; read 27 November 2026).
- Wyckoff News, report of 31 July 2026 on the treatment programme (read 28 November 2026).
- Ridgewood Water, quarterly notices (could not be reached on 28 November 2026). New Jersey PFAS limits: N.J.A.C. 7:10.
Every PFOA and PFOS result
| Facility and sampling point | Date | PFAS | ppt |
|---|---|---|---|
| Ames 3 TP – Entry Point to Dist. System | 3/6/2023 | PFOA | 24.7 |
| Ames 3 TP – Entry Point to Dist. System | 9/11/2023 | PFOA | 28.0 |
| Ames 3 TP – Entry Point to Dist. System | 3/6/2023 | PFOS | 9.5 |
| Ames 3 TP – Entry Point to Dist. System | 9/11/2023 | PFOS | 10.3 |
| Carr TP – Entry Point to Dist. System | 10/24/2023 | PFOA | below 4 (reporting level) |
| Carr TP – Entry Point to Dist. System | 3/1/2023 | PFOA | 9.7 |
| Carr TP – Entry Point to Dist. System | 10/24/2023 | PFOS | below 4 (reporting level) |
| Carr TP – Entry Point to Dist. System | 3/1/2023 | PFOS | below 4 (reporting level) |
| Cedar Hill TP – Entry Point to Dist. System | 3/7/2023 | PFOA | 29.8 |
| Cedar Hill TP – Entry Point to Dist. System | 9/11/2023 | PFOA | 30.4 |
| Cedar Hill TP – Entry Point to Dist. System | 3/7/2023 | PFOS | 11.7 |
| Cedar Hill TP – Entry Point to Dist. System | 9/11/2023 | PFOS | 9.8 |
| East Ridgewood TP – Entry Point to Dist. System | 3/5/2024 | PFOA | 24.2 |
| East Ridgewood TP – Entry Point to Dist. System | 9/12/2023 | PFOA | 21.5 |
| East Ridgewood TP – Entry Point to Dist. System | 3/5/2024 | PFOS | 9.5 |
| East Ridgewood TP – Entry Point to Dist. System | 9/12/2023 | PFOS | 9.3 |
| Irving TP – Entry Point to Dist. System | 3/4/2025 | PFOA | 13.3 |
| Irving TP – Entry Point to Dist. System | 9/26/2024 | PFOA | 25.6 |
| Irving TP – Entry Point to Dist. System | 3/4/2025 | PFOS | 6.9 |
| Irving TP – Entry Point to Dist. System | 9/26/2024 | PFOS | 13.8 |
| Main TP – Entry Point to Dist. System | 11/14/2023 | PFOA | 27.2 |
| Main TP – Entry Point to Dist. System | 3/6/2023 | PFOA | 24.7 |
| Main TP – Entry Point to Dist. System | 11/14/2023 | PFOS | 8.2 |
| Main TP – Entry Point to Dist. System | 3/6/2023 | PFOS | 7.9 |
| Marr – Representative Interconnection | 1/8/2025 | PFOA | below 4 (reporting level) |
| Marr – Representative Interconnection | 7/16/2024 | PFOA | below 4 (reporting level) |
| Marr – Representative Interconnection | 1/8/2025 | PFOS | below 4 (reporting level) |
| Marr – Representative Interconnection | 7/16/2024 | PFOS | below 4 (reporting level) |
| Passaic Valley – Representative Interconnection | 12/5/2023 | PFOA | 7.7 |
| Passaic Valley – Representative Interconnection | 3/6/2023 | PFOA | 7.2 |
| Passaic Valley – Representative Interconnection | 6/7/2023 | PFOA | 11.5 |
| Passaic Valley – Representative Interconnection | 9/12/2023 | PFOA | 10.0 |
| Passaic Valley – Representative Interconnection | 12/5/2023 | PFOS | 4.8 |
| Passaic Valley – Representative Interconnection | 3/6/2023 | PFOS | 5.7 |
| Passaic Valley – Representative Interconnection | 6/7/2023 | PFOS | 7.4 |
| Passaic Valley – Representative Interconnection | 9/12/2023 | PFOS | 7.8 |
| Prospect TP – Entry Point to Dist. System | 3/1/2023 | PFOA | 29.8 |
| Prospect TP – Entry Point to Dist. System | 9/12/2023 | PFOA | 31.4 |
| Prospect TP – Entry Point to Dist. System | 3/1/2023 | PFOS | 13.7 |
| Prospect TP – Entry Point to Dist. System | 9/12/2023 | PFOS | 12.9 |
| Salem TP – Entry Point to Dist. System | 3/7/2023 | PFOA | 15.1 |
| Salem TP – Entry Point to Dist. System | 9/12/2023 | PFOA | 19.7 |
| Salem TP – Entry Point to Dist. System | 3/7/2023 | PFOS | below 4 (reporting level) |
| Salem TP – Entry Point to Dist. System | 9/12/2023 | PFOS | 5.4 |
| Stevens TP – Entry Point to Dist. System | 5/29/2024 | PFOA | 31.0 |
| Stevens TP – Entry Point to Dist. System | 9/12/2023 | PFOA | 28.3 |
| Stevens TP – Entry Point to Dist. System | 5/29/2024 | PFOS | 9.2 |
| Stevens TP – Entry Point to Dist. System | 9/12/2023 | PFOS | 8.8 |
| Twinny TP – Entry Point to Dist. System | 3/7/2023 | PFOA | below 4 (reporting level) |
| Twinny TP – Entry Point to Dist. System | 9/11/2023 | PFOA | below 4 (reporting level) |
| Twinny TP – Entry Point to Dist. System | 3/7/2023 | PFOS | below 4 (reporting level) |
| Twinny TP – Entry Point to Dist. System | 9/11/2023 | PFOS | below 4 (reporting level) |
| UWNJ Ridgewood Consecutive Connection – Representative Intertie | 3/1/2023 | PFOA | 9.8 |
| UWNJ Ridgewood Consecutive Connection – Representative Intertie | 4/30/2024 | PFOA | 29.2 |
| UWNJ Ridgewood Consecutive Connection – Representative Intertie | 6/7/2023 | PFOA | 12.8 |
| UWNJ Ridgewood Consecutive Connection – Representative Intertie | 9/12/2023 | PFOA | 7.5 |
| UWNJ Ridgewood Consecutive Connection – Representative Intertie | 3/1/2023 | PFOS | below 4 (reporting level) |
| UWNJ Ridgewood Consecutive Connection – Representative Intertie | 4/30/2024 | PFOS | 10.9 |
| UWNJ Ridgewood Consecutive Connection – Representative Intertie | 6/7/2023 | PFOS | 4.1 |
| UWNJ Ridgewood Consecutive Connection – Representative Intertie | 9/12/2023 | PFOS | below 4 (reporting level) |
| Van Houten TP – Entry Point to Dist. System | 3/1/2023 | PFOA | 20.1 |
| Van Houten TP – Entry Point to Dist. System | 9/11/2023 | PFOA | 18.8 |
| Van Houten TP – Entry Point to Dist. System | 3/1/2023 | PFOS | 12.6 |
| Van Houten TP – Entry Point to Dist. System | 9/11/2023 | PFOS | 8.1 |
| Waldo TP – Entry Point to Dist. System | 3/6/2023 | PFOA | 21.2 |
| Waldo TP – Entry Point to Dist. System | 9/11/2023 | PFOA | 22.7 |
| Waldo TP – Entry Point to Dist. System | 3/6/2023 | PFOS | 8.2 |
| Waldo TP – Entry Point to Dist. System | 9/11/2023 | PFOS | 7.9 |
| West End TP – Entry Point to Dist. System | 5/29/2024 | PFOA | 27.8 |
| West End TP – Entry Point to Dist. System | 9/12/2023 | PFOA | 27.0 |
| West End TP – Entry Point to Dist. System | 5/29/2024 | PFOS | 7.6 |
| West End TP – Entry Point to Dist. System | 9/12/2023 | PFOS | 8.1 |
| Wortendyke TP – Entry Point to Dist. System | 3/13/2023 | PFOA | 20.2 |
| Wortendyke TP – Entry Point to Dist. System | 3/5/2024 | PFOA | 20.8 |
| Wortendyke TP – Entry Point to Dist. System | 3/13/2023 | PFOS | 8.8 |
| Wortendyke TP – Entry Point to Dist. System | 3/5/2024 | PFOS | 7.7 |